Low-Tech Process-Based Restoration

Why we promote Low-Tech Process-Based Restoration (LTPBR) over more conventional riverscape restoration techniques at PEN:

  1. Compatible with ‘novel’ ecosystems: The proliferation of non-native species and the ecosystem pressures from global climate change make it impractical to use historic or contemporary references to set restoration goals and gauge restoration success. Process-based restoration aims to restore ecological criteria (processes) that do not require superficial comparisons with non-existent unimpaired references.

  2. Compatible with natural dynamic equilibriums: More conventional stream restoration techniques aim to establish stability in the physical structure of waterways. Although the level of physical stability may be an important consideration for human infrastructure, well-functioning ecological systems require interactions with natural variation and stochastic disturbance. A high degree of physical stability is not necessary in the vast majority of impaired waterways across the western US and attempts to impose non-natural stability elevates project costs and impairs the ecological functions of those ecological systems.

  3. Scalable to landscape-scale restoration: LTPBR greatly increases restored miles of waterway per river-mile for any given budget relative to more conventional methods. This is mainly because these projects do not require engineering design, they do not require heavy equipment, and large volumes of imported imported materials.

  4. Community engagement: We believe that the long-term future of conservation and restoration practice is in the hands of average individuals and their relationship with their landscape. LTPBR is an approachable practice for ordinary people with burgeoning ecological knowledge and interest. Not only can LTPBR be a tool to help heal the ecological integrity of our waterways, it may also prove to be an important sociopolitical tool to help improve human relationship with our environment and even local communities.

Low-Tech Process-Based Restoration Project Development and Costs

How much will your implementation cost? There is a considerable amount of variance in the cost of each project and each structure due to various implementation considerations. We want to help you develop a project that can minimize your costs given your unique conditions and goals. Some things to consider: How far away is live woody material to the site? What is the soil texture at the site? What are the dimensions of the structures that you propose? Are you using posts for your structures? How easy is access to the site?  We are happy to provide free quotes for your project and you may also reference our standard rates below to get a rough idea. 

Billing Rates: 2026-2027

Crew Member rate: $60.00/hr

Project Manager rate: $70.00/hr

Food per diems: Standard Federal Rate: $68.00/day/crew member

Crew lodging: Varies: Camping rate: $25/day, $150/week (for full crew)

To keep costs down, we would prefer to camp on-site or find local dispersed camping: If there is a way to reduce our costs, we will charge you accordingly. 

Mobilization: *$0.70/mile from last job site per vehicle

*Standard Federal Rate plus hourly labor rate. Daily travel from lodging to work site will be added to this cost. 

Chainsaw rates: $15/day/saw, $70/week/saw

Post-Pounder Rate: $35/day/post-pounder, $210/week/post-pounder

Grip-Hoist Rates: $100/day/grip-hoist, $600/week/grip-hoist

ATV Rates: $250/week/ATV

Truck rates: $350/week

Cargo Trailer: $200/week

Posts: Typically about $5/post

Contact us

Interested in working together? Fill out some info and we will be in touch shortly. We can’t wait to hear from you!